Project Case Study
Comcast Plano Tenant Fit-Out
Pearland supplied welded frames and glazing assemblies for the Comcast tenant fit-out in Plano, supporting a fast-moving office renovation with varied opening conditions.
93 Openings
25 Welded Interior Frames
68 Glazing Assemblies
90 Minute-Rated Assemblies
Challenge
Retrofit conditions produced irregular opening dimensions and late design revisions within a short lead time.
Pearland
Solution
Pearland fabricated frames and glazing assemblies to revised field dimensions and coordinated hardware preparations with the project hardware schedule.
Outcome
Frames were delivered within the required schedule and aligned with revised project specifications during the tenant build-out.